Demonstration portfolio
Five worked examples for one fictional issuer.
Northstar Copper Corp and its Aurora Ridge property are invented. Each demonstration below is built from sample data to show the shape of a deliverable and lets you try the part that matters: filtering an archive, switching map layers, searching a document index, or stepping through an approval. None of them is a live service, and none is client work.
Demonstration 01 · Websites
Issuer site and news archive
A news archive is where most issuer sites drift: inconsistent titles, missing categories, links to drafts instead of filed versions. This archive gives every release a category and one title style, so visitors can find what they need.
What it shows
- One title format and a category on every release
- Releases and technical reports linked from the project page
- A site address that belongs to the issuer, not to Mindev
Lives on your company's own domain
News releases
9 sample releases
- DrillingAssays received for holes AR-01 to AR-03 at Aurora Ridge
- FinancingNorthstar closes private placement
- DrillingFirst holes completed on the Aurora fault target
- TechnicalInduced polarization survey summary added to the project page
- FinancingNorthstar announces non-brokered private placement
- DrillingDrill program begins at Aurora Ridge, Block A
- CorporateNorthstar appoints vice president, exploration
- TechnicalTechnical report filed for the Aurora Ridge property
- CorporateNorthstar announces annual meeting date
Demonstration 02 · Maps
Layered property map
One property, five layers, each from its own source. Switch layers on and off, jump to a saved view, or pick a drill hole from the table to find it on the map.
| Hole | Status | Claim | Map |
|---|---|---|---|
| AR-01 | Completed | Aurora 2 | |
| AR-02 | Completed | Aurora 5 | |
| AR-03 | Completed | Aurora 3 | |
| AR-04 | Completed, assays pending | Aurora 4 | |
| AR-05 | Planned | Aurora 6 | |
| AR-06 | Planned | Aurora 2 |
What it shows
- Layers kept separate, so one can change without redrawing the rest
- Saved views for a release figure, a tenure check or field planning
- Map and table drawn from the same hole list
Lives on your site for public layers, or a private workspace for deal material
Demonstration 03 · Data rooms
Data-room document index
The index is the part of a data room reviewers use most. This sample one is public text with no files behind it: search it, or narrow it to one folder, to see how a prepared room is organised.
16 sample documents
| Ref | Document | Folder | Type | Version | Access |
|---|---|---|---|---|---|
| 01.01 | Articles and certificate of incorporation | Corporate | v1 · final | Counsel | |
| 01.02 | Board resolution approving the option | Corporate | v1 · final | Counsel | |
| 01.03 | Option agreement summary | Corporate | v2 · replaces v1 | Counsel | |
| 02.01 | Claim register extract, Aurora 1 to 6 | Tenure and permits | XLSX | v3 · current | Counsel Technical |
| 02.02 | Claim map, Aurora Ridge | Tenure and permits | v3 · current | Counsel Technical | |
| 02.03 | Exploration permit and conditions | Tenure and permits | v1 · final | Counsel | |
| 03.01 | Technical report, Aurora Ridge property | Technical reports | v1 · filed | Technical | |
| 03.02 | Qualified person consent | Technical reports | v1 · final | Technical | |
| 03.03 | Historic exploration summary | Technical reports | v1 · reference | Technical | |
| 04.01 | Drill collar and survey table | Drill data | CSV | v4 · approved | Technical |
| 04.02 | Drill logs, AR-01 to AR-04 | Drill data | v2 · approved | Technical | |
| 04.03 | Assay certificate index | Drill data | XLSX | v2 · approved | Technical |
| 04.04 | Quality control summary memo | Drill data | v1 · draft | Technical | |
| 05.01 | Induced polarization survey report | Geophysics | v1 · final | Technical | |
| 05.02 | Geophysics grids with read-me | Geophysics | ZIP | v1 · reference | Technical |
| 06.01 | Exploration expenditure summary | Financial | XLSX | v1 · final | Issuer only |
| No sample documents match. Try another word or choose All folders. | |||||
Demonstration 04 · Portals and workflows
Release approval walkthrough
Follow a fictional drill update from draft to ready-to-publish. At each stage, see who acts, what is checked and what goes on the record. The buttons only move through this example; nothing is approved, sent or published.
-
Stage 1 of 5 Draft
Draft prepared
- Who acts
- Company geologist
- What happens
- Writes the drill update and attaches figure set v1 and the hole table.
- On the record
- Draft v1 created with figures v1.
-
Stage 2 of 5 Change requested
Figure and fact check
- Who acts
- Mindev, where the scope includes checking
- What happens
- Every hole ID, count and label in the text and figures is compared with the approved hole table. One label on the drill plan does not match: AR-04 is marked as AR-03.
- On the record
- Check on v1: one mismatch flagged. Figures v2 issued with the label corrected.
-
Stage 3 of 5 Approved with edits
Qualified person review
- Who acts
- The company's qualified person
- What happens
- Reviews technical content in draft v2 with figures v2 and asks for one wording change.
- On the record
- Approved with edits; draft v3 issued.
-
Stage 4 of 5 Approved
Disclosure review
- Who acts
- Chief financial officer and counsel
- What happens
- Review disclosure wording and timing on draft v3.
- On the record
- Disclosure review complete on v3.
-
Stage 5 of 5 Ready
Ready to publish
- Who acts
- A company officer decides when to release
- What happens
- The site news post, project page facts and deck slide are prepared to match v3, waiting for the company's release.
- On the record
- Site, project page and deck staged to v3. Release timing is the company's decision.
Lives in the tools your team already uses, or a private workspace where the scope calls for one
Demonstration 05 · Presentations and data
One fact table, three outputs
Every number on the slide, the fact sheet and the website summary comes from one approved table. When a fact changes, all three change together, and anything that disagrees gets flagged.
| Fact | Value | Source | Approved by |
|---|---|---|---|
| Mineral claims | 6 | Claim register extract v3 | Company officer |
| Holes completed, current program | 4 | Collar table v4 | Qualified person |
| Holes planned | 2 | Program plan v2 | Qualified person |
| Technical report | Filed | Report index | Company officer |
| Next milestone | Assays for AR-04 | Program plan v2 | Qualified person |
Fact sheet · sample
Aurora Ridge property
- 6 mineral claims, Aurora 1 to 6
- 4 holes completed in the current program; 2 planned
- Technical report filed
- Next: assays for AR-04
Consistency check
The previous fact sheet said 3 holes completed. The approved table says 4, so this version was updated and the change logged.
Project summary
Aurora Ridge
- Claims
- 6
- Holes completed
- 4
- Holes planned
- 2
- Technical report
- Filed
Figures on this page come from the approved fact table, v3.
What it shows
- Each fact has a source and an approver
- Slide, fact sheet and web summary read from the same row
- A stale number is caught and recorded rather than copied forward
Lives in files delivered to you, with summaries on your own site
From demonstration to your work
Your version is scoped to your company.
A real engagement starts from your projects, your data and your approvers. Public work goes on your domain; private material goes in a separate access-controlled workspace agreed for the job. Quotes, agreements, billing and conversation stay with Mindev.
Client work appears here only with that client's written permission.